Giant Mountains
Tree Top Walkway
The company KASPER CZ supplied prefabricated parts for the floor structure of the lookout tower to the Tree Top Walk. The delivery consisted of 150 pieces ranging from 4 to 10 meters in length, each made of three solid load-bearing elements complemented by floor tread beams. All were made from Douglas fir lumber.



















